Power Inverter (120V Outlet) labor time
Power Inverter (120V Outlet) takes about 0.7 hr of shop labor on a typical vehicle. Across 1,087 vehicle and engine combinations from 21 makes, most fall between 0.7 and 1.2 hours, and the longest take up to 2.6 hours. Mercedes-Benz, Ford and BMW vehicles tend to take the longest; Hyundai, Chrysler and Lincoln the least. The exact time depends on your car, so look yours up below or pick it on the home page.
Enter a rate to see the labor cost of each job. Many US shops charge somewhere between $100 and $200 an hour.
At $150 an hour, labor for this job is usually $105 to $180, about $105 on a typical vehicle. Parts are extra.
How long it takes across all vehicles
Hours, in half hour steps. Each bar is how many vehicle and engine combinations fall in that range.
Power Inverter (120V Outlet) time on popular vehicles
- 2026 Ford F-150 2.7L V6 EcoBoost0.7 hr
- 2026 Ford Ranger 2.3L I4 EcoBoost0.7 hr
- 2026 Ford F-250 6.7L V8 Power Stroke Diesel1.3 hr
- 2026 Ram 1500 5.7L V8 Hemi eTorque0.7 hr
- 2026 Chevrolet Silverado 1500 3.0L I6 Duramax LZ00.7 hr
- 2026 Toyota Tacoma 2.4L Turbo I4 (T24A-FTS)0.7 hr
- 2026 Chevrolet Tahoe 3.0L I6 Duramax0.7 hr
Power Inverter (120V Outlet) time by make
| Make | Typical | Most vehicles | Vehicles |
|---|---|---|---|
| Mercedes-Benz | 1.4 hr | 1.4 to 1.4 | 8 |
| Ford | 1.2 hr | 0.7 to 1.3 | 266 |
| BMW | 1.2 hr | 1.2 to 1.2 | 7 |
| Porsche | 1.0 hr | 1.0 to 2.0 | 19 |
| Kia | 1.0 hr | 0.7 to 1.0 | 17 |
| Chevrolet | 0.7 hr | 0.7 to 1.0 | 218 |
| GMC | 0.7 hr | 0.7 to 0.7 | 170 |
| Ram | 0.7 hr | 0.7 to 0.7 | 127 |
| Toyota | 0.7 hr | 0.7 to 0.7 | 99 |
| Nissan | 0.7 hr | 0.7 to 0.7 | 47 |
| Jeep | 0.7 hr | 0.7 to 0.7 | 24 |
| Cadillac | 0.7 hr | 0.7 to 0.7 | 23 |
| Honda | 0.7 hr | 0.7 to 0.7 | 17 |
| Lincoln | 0.7 hr | 0.7 to 0.7 | 17 |
| Chrysler | 0.7 hr | 0.7 to 0.7 | 9 |
| Hyundai | 0.7 hr | 0.7 to 0.7 | 7 |
Other electrical repairs
- Wiper Linkage
- Wiper Motor - Front
- Side Mirror Assembly
- Wiper Switch
- Headlight Assembly
- Washer Reservoir
- Tail Light Bulb
- Radio/Head Unit
- Combination Switch
- Subwoofer
- Battery Cable - Negative
- Battery Cables - Both
Hours are what a professional technician takes with the right tools, the same way shops quote jobs. Figures come from the Open Labor Project database.